California Institute of Technology

California Institute of Technology

California Institute of Technology

Pasadena, CA

SERVICE LINE: Snyder Langston

  • 2012 3form 7th Annual People’s Choice Installation Contest Grand Prize Winner

6,000 s.f. renovation of an existing laboratory in the Beckman Behavioral Biology Building. As a design-build project, it involved coordination and planning with the client and professor in order to determine the architectural, structural, mechanical and code-required needs and develop them into a complete design package.

The new lab includes surgery rooms, a wet lab, dark room with moveable black-out curtains, electrode fabrication and equipment shops, offices, interaction area and a unique hallway with LED backlit resin panels. Construction of the laboratory space involves strategic location of temporary barricades and logistics planning of construction flow as the project is conducted in an fully occupied three-story lab/science building.