Previous Slide Next Slide

Pelican Hill Resort

Pelican Hill Resort

Pelican Hill Resort

Newport Coast, CA

SERVICE LINE: Snyder Langston

Snyder Langston provided pre-construction and construction services for the hotel’s core, spa, and Coliseum pool and pool grill complex at the Newport Coast Resort. The hotel core, spa, pool and grill areas totaled 127,622 s.f.

The 15,683 s.f. Coliseum pool building is constructed of steel and metal gauge framing covered with a custom color clay tile roof. The exterior is clad with an Italian Vero Slaked lime plaster system with aluminum clad Alder doors and windows. The tongue and groove inlaid wood beam ceiling complements the extensive Alder millwork.

The Cumaroo wood flooring in the dining room and bar area are accentuated by the brick paver entry hall. There is a full-service kitchen and a patron pool shower facility on the lower level and a child day care room and exterior play area on the upper level. The exterior patio dining areas employ radiant floor and overhead heating.

Perched above the Pacific Ocean, the resort features sweeping 180-degree coastal vistas. The resort’s architecture is elegant, comfortable and carefully integrated into its surroundings.

Project Testimonial

Pelican Hill Resort

…They stand out for the mind-set it takes to create a product that will withstand the test of time… …I know them to be a firm of integrity with respect to making and keeping commitments...